Smart Export Guarantee: How SEG Export Payments Work

Post by : Editor on 20.11.2026

The smart export guarantee (SEG) requires some licensed electricity suppliers to pay you for surplus electricity your solar panels or other small-scale generator send to the grid. You apply to a supplier that offers a SEG tariff, the supplier pays you per unit exported, and each supplier sets its own rate. Rates are usually well below what you pay to import a unit, so the scheme rewards exporting but does not replace the saving from using your own power.

This guide covers who qualifies, how SEG tariffs differ, what current rates look like, how to apply and how the scheme sits alongside the older feed-in tariff. Rates and rules change, so each figure below carries the date it was checked, 17 November 2026.

What is the smart export guarantee?

The smart export guarantee is a government-backed scheme that launched on 1 January 2020. Ofgem, the energy regulator, describes it as requiring some electricity suppliers, called SEG licensees, to pay small-scale generators for low-carbon electricity they export to the National Grid (Ofgem, checked 17 November 2026).

The scheme covers five technologies: solar PV, wind, micro combined heat and power, hydro and anaerobic digestion. The installation must be in Great Britain and have a total installed capacity of no more than 5MW, or 50kW for micro-CHP. A home solar system sits far below that limit. Each licensee sets its own payment rate and contract length, but any SEG tariff must be above zero.

The payment is for electricity you export, based on readings from your export meter. Electricity you use in the house is never paid for, though using it still saves you the cost of importing it. If you are weighing up a system, the solar PV guide explains how panels generate and where the power goes.

Who can get SEG payments?

You can get SEG payments if you have an eligible generator, a certified installation and a meter that records exports. The government guidance on gov.uk sets out three conditions (gov.uk, checked 17 November 2026):

  • Your installation and installer are certified through the Microgeneration Certification Scheme (MCS), or an equivalent scheme accepted as such.
  • You have a meter capable of providing half-hourly export readings, which is typically a smart meter.
  • You are not receiving export payments under the Feed-in Tariffs scheme.

Your SEG supplier does not have to be the company you buy electricity from. Ofgem states that you can use any SEG licensee, and that licensees must offer a SEG tariff to all eligible generators (Ofgem generators page, checked 17 November 2026). Individual suppliers can add their own conditions, for example Octopus Energy ties its Outgoing tariffs to its own import customers. See export metering for how export readings are taken.

Is FIT or SEG better?

For a new solar installation the question does not arise, because the feed-in tariff closed to new applicants on 1 April 2019 (Ofgem, checked 17 November 2026). SEG is the route open to new systems.

Existing FIT generators keep their payments for the life of their support, which Ofgem says lasts between 10 and 25 years depending on technology, capacity and commissioning date. You cannot claim SEG while receiving FIT export payments. If you have an older system, the pages on how long feed-in tariffs last and historic FIT rates cover what you are entitled to.

What is the current export tariff for solar electricity in the UK?

There is no single national rate. Each SEG licensee publishes its own, and they change. As one worked example, Octopus Energy lists these export options on its Outgoing page (Octopus Energy, checked 17 November 2026):

Octopus Outgoing optionWhat it pays
Outgoing Octopus (variable)12p per kWh for every unit exported
Prime Outgoing (12-month fixed term)16p per kWh from 4pm to 7pm, 9p per kWh the rest of the day
Agile Outgoing (12-month fixed term)Half-hourly rates matched to day-ahead wholesale prices, uncapped

Octopus requires you to be an Octopus customer, to have a smart meter that supplies half-hourly export data and, for these tariffs, to pair them with certain import tariffs. Treat it as one supplier’s rates on one day. Ofgem publishes the list of SEG licensees so you can check each one’s current terms.

How SEG rates compare with what you pay

Export rates sit far below import prices, so solar is worth more when you use the power yourself. Ofgem’s energy price cap for 1 October to 31 December 2026 allows a national average of 26.32p per kWh for electricity paid by direct debit (Ofgem, checked 17 November 2026). A flat 12p export rate pays less than half of that (12 divided by 26.32 is about 0.46).

A unit you use at home saves you more than twice what the same unit earns when exported, so running appliances in daylight hours helps and a solar battery can make sense: it stores midday surplus for the evening instead of selling it cheaply. Whether a battery pays for itself depends on its price and your usage, so ask installers for figures based on your own consumption.

How to find the best smart export guarantee rates

No official league table ranks SEG tariffs, so the best rate depends on your own system and habits. Start with Ofgem’s list of licensees and check each supplier’s current terms, since rates move and some suppliers withdraw or change tariffs. Compare the per-unit rate, the contract length, any requirement to take your imports from the same supplier and whether the tariff pays more at certain times of day. A higher headline rate is worth less if it only applies in a narrow evening window that your panels cannot supply.

Set the offer against your own export pattern. A household that exports mostly at midday gains little from a tariff that pays extra only from 4pm to 7pm, unless it has a battery to move the surplus into that window. Check again each year, because gov.uk advises making sure your tariff stays competitive.

Types of SEG tariff and how to compare them

Suppliers must offer a tariff but choose its terms, such as whether it is fixed or variable (gov.uk). When you compare, look at these points:

  • The rate per kWh, and whether it is flat or varies by time of day.
  • Whether the rate is fixed for a set term or can change, and what notice the supplier gives.
  • Whether you must also buy your electricity from that supplier, and on which import tariff.
  • How and how often payments are made, which the supplier should state in its terms.
  • Whether the tariff suits your setup. Gov.uk notes that storage devices such as home batteries, or electric vehicles able to import and export, may also benefit, and your prospective supplier can advise.

Ofgem advises generators to shop around, and gov.uk says to check regularly that your tariff remains competitive. You are free to switch SEG supplier when a better offer appears, subject to the terms you signed up to.

How to apply for SEG payments

  1. Confirm that your installer gave you an MCS certificate and that your meter can record half-hourly exports. If you are unsure, ask your electricity supplier about a smart meter.
  2. Choose a SEG licensee from Ofgem’s list and read its tariff terms.
  3. Apply using the licensee’s own process, which is published on its website. Expect to give your installation details and certificate.
  4. Wait for your export arrangement to be set up. Octopus, for one, says its process takes about 2 days to apply, then 1 to 4 weeks for the network operator to create an export meter point, then about 5 days for enrolment (Octopus, checked 17 November 2026).

Ask your installer whether they help with registration, though the choice of supplier stays with you.

How much could you earn from exporting?

Earnings are exported units multiplied by your rate. As arithmetic only, 1,000 kWh exported would earn £120 at 12p per kWh, £160 at 16p and £90 at 9p. How many units you export depends on your system size, your roof, the weather and how much power you use while the sun is shining, so a quote from an MCS installer based on your usage is more reliable than any average. The solar panel cost guide works through a payback example using these rates.

Is SEG income taxable?

The gov.uk SEG guidance does not set out the tax treatment, and the answer depends on your circumstances, for example whether the property is your home, a rental or a business. Check HMRC’s guidance or ask HMRC or an accountant. The page on the tax position of feed-in tariff payments gives background on how generation income has been treated.

Frequently asked questions

Do I need a smart meter to get SEG payments?

You need a meter that can provide half-hourly export readings, and gov.uk says that is typically a smart meter. You can ask your energy supplier to fit one. Some suppliers, including Octopus, say a smart meter supplying half-hourly export data is a condition of their export tariffs.

Can I get SEG and the feed-in tariff together?

No. Gov.uk states that you cannot receive a SEG tariff while you are receiving export payments under the Feed-in Tariffs scheme. FIT closed to new applicants on 1 April 2019, so only older installations receive it.

Does my SEG supplier have to be my electricity supplier?

No. Ofgem says you can use any SEG licensee, even if it is not your current energy supplier. Some suppliers do restrict their best export tariffs to their own import customers, so read the terms.

Can a supplier pay me nothing for exports?

No. Ofgem states that a SEG tariff must always remain above zero. Licensees must also offer a tariff to all eligible generators, though they set the rate themselves.

Which technologies qualify?

Solar PV, wind, micro-CHP, hydro and anaerobic digestion qualify, up to 5MW (50kW for micro-CHP), in Great Britain. For most households that means solar panels.